Defective Material In The Contract Of Work
If the materials are supplied by the contractor, the contractor shall be liable to the owner for defective materials in the same manner as the seller.
If the materials are provided by the owner, the contractor is obliged to use them with due care and to return the account and surplus.
If, during the execution of the work, it is discovered that the material provided by the owner or the place indicated by him for the execution of the work is defective, or if any other situation arises which may jeopardize the proper or timely execution of the work, the contractor shall immediately notify the owner of this situation; if he fails to do so, he shall be liable for the consequences arising therefrom.